This blog is not intended for the General Public, But all blog readers are Welcome.

This is mostly Notes and Links for myself,
and maybe someday, this will provide insight and a bit of history for all the kids that call me Grandpa;
NutMeg, C-Kid, Z-Man, Lulu, and Dabbers,
I-Man and O-Man,
J-Man and S-Man,
Nat, A-Girl, and J-Boy.

For reference in this blog: Chip is my Son, and Carolyn is my Sister.

Sunday, September 4, 2011

Well Work

Last year the pipes around the Hanger Well were covered with tarps and included a heater to avoid freezing.

This last week, my son and I worked move the pipes underground. The task was bigger then necessary as we took the opportunity to replace old aluminium wire with copper wire for power to the Well. The new power will also power the Shop's Three-Phase Rotary Converter, which will be located there for noise abatement.

The Pressure Switch for the well will be located in the Shop, a relay will be at the well area to drive the pump starter circuit.

Likewise, the on/off control for the Rotary Converter will be in the Shop, while a relay and the Starter Circuit will be at the Well area.

--

No comments:

Post a Comment